A stopped boiler is a production problem. Start with the right three facts.
Unit code, burner fault code and what changed before the trip. With those three, the duty engineer can usually narrow the fault before the first call ends — without them, every conversation starts from zero.
Remote triage
Send the unit code, fault code and a photo of the control screen. Response within one working day, usually the same shift for a stopped unit. No charge for the first triage.
Spare parts
Stock items leave Taikang in 2–3 working days: flame detectors, igniters, pressure switches, pump seals, gauge glass, electrode tips. Air freight for stopped units.
Site service
Commissioning, warranty repair and paid overhauls by factory engineers or a trained partner, depending on the country and the scope of pressure-part work.
Five symptoms and the first check
These are the checks an operator can do safely. Anything inside the pressure envelope or the burner gas train is for a qualified engineer.
| Symptom | Likely cause | First check | Do not |
|---|---|---|---|
| Steam pressure falls at steady load | Fouled fireside, wrong fuel pressure, or feedwater temperature drop | Flue-gas temperature at the outlet; compare with commissioning data. Check burner gas pressure at the train. | Raise the set point to compensate — it hides the fouling. |
| Burner locks out on start-up | Air in the gas line, flame detector dirty, or ignition electrode gap | Read the lockout code; clean the detector; check the electrode gap and the gas train vent. | Reset more than three times without finding the code. |
| Feedwater pump cavitates | Suction strainer blocked, low tank level, or water above 80 °C without a deaerator | Strainer differential, tank level and feedwater temperature. | Throttle the discharge to quieten the noise. |
| Water carries over with steam | High total dissolved solids, foam, or sudden load change | Boiler water TDS and alkalinity; blowdown schedule; steam separator condition. | Add anti-foam as a permanent fix. |
| High flue-gas temperature | Scale on the waterside, soot on the fireside, or bypassed economiser | Compare stack temperature with the commissioning sheet; inspect the economiser bypass damper. | Keep running to the next planned shutdown. |
Send the completed checks with the unit code. If the boiler is under warranty, say so in the subject line — warranty cases are routed to the engineer who commissioned the unit where records allow.
Manuals, drawings and certificates
The installation, commissioning and maintenance manuals are published by product family and can be downloaded without a login. Each PDF carries a SHA-256 hash, so a printed copy can be checked against the file we issued.
- Manual library — WNS, SZS, DZL, YLW, electric, CFB, hot air, pressure vessels
- Verify a manual file against its SHA-256 hash
- GA drawing, foundation plan and piping diagram: request with the unit code.
- Pressure-vessel certificate, welding records and hydro-test report: issued with the unit; duplicates on request.
What to put in the email
- Unit code (YXB-…)
- Site country and city
- Fault code from the burner or PLC
- Operating hours since commissioning
- What changed before the trip
- Nameplate photo, if the code is unreadable
Installation, commissioning and maintenance manuals
The same documents that ship with the unit, published here so a second shift, a service contractor or a new owner can reach them. Each PDF carries a SHA-256 fingerprint.
WNS / CWNS fire-tube oil & gas
Steam and hot-water packaged units, 1–20 t/h
Read the manual →SZS D-type water-tube
Oil and gas, 4–40 t/h, including superheated variants
Read the manual →DZL / SZL chain-grate biomass
Biomass and coal, 1–40 t/h
Read the manual →CFB — DHX / SHX / QXX
Circulating fluidised bed boilers
Read the manual →Electric — WDR / LDR
Electric steam boilers and steam generators
Read the manual →Thermal oil — YLW / YGL / YY(Q)W
Thermal oil heaters and hot-oil systems
Read the manual →Hot air — LRF / ZRFQ / WRF
Hot air furnaces for drying and process air
Read the manual →Pressure vessels and autoclaves
Steam storage, AAC autoclaves and pressure vessels
Read the manual →Burners, softeners, pumps, controls
Auxiliary equipment and control cabinets
Read the manual →Full library, including the printable A4 log sheets: yxboiler.com/manuals. To check a PDF against the file we issued, use the SHA-256 verification page. A manual that does not match your serial number is the wrong manual — send the unit code to [email protected] and we will send the correct edition.
Commissioning, training and overhauls
Quoted per project, with the scope written before travel.
Commissioning
Cold and hot commissioning checks, burner set-up, safety interlock test, operator walk-through and a signed handover sheet.
Operator training
Half-day to two-day programme on the actual unit: start-up, blowdown, water treatment, alarm handling and the daily log.
Overhaul
Fireside cleaning, tube inspection, refractory repair, burner service and control upgrade, scheduled around your shutdown.
Support questions
What should I send with a service request?
Unit code, nameplate photo, site country, fault description, operating hours and the burner fault code. For pressure-part issues include the pressure-vessel certificate number.
Do you support burners and controls from other suppliers?
Yes, for boilers we supplied. Send the burner make, model and controller type; we keep commissioning records for the common gas, oil and biomass burners fitted at the works.
How fast are spare parts dispatched?
Stock items leave Taikang in two to three working days; made-to-order parts such as tubes, furnace sections and tube plates are quoted with a production slot. Air freight is used for stopped units.