Service desk

A stopped boiler is a production problem. Start with the right three facts.

Unit code, burner fault code and what changed before the trip. With those three, the duty engineer can usually narrow the fault before the first call ends — without them, every conversation starts from zero.

01

Remote triage

Send the unit code, fault code and a photo of the control screen. Response within one working day, usually the same shift for a stopped unit. No charge for the first triage.

02

Spare parts

Stock items leave Taikang in 2–3 working days: flame detectors, igniters, pressure switches, pump seals, gauge glass, electrode tips. Air freight for stopped units.

03

Site service

Commissioning, warranty repair and paid overhauls by factory engineers or a trained partner, depending on the country and the scope of pressure-part work.

Fault triage

Five symptoms and the first check

These are the checks an operator can do safely. Anything inside the pressure envelope or the burner gas train is for a qualified engineer.

SymptomLikely causeFirst checkDo not
Steam pressure falls at steady loadFouled fireside, wrong fuel pressure, or feedwater temperature dropFlue-gas temperature at the outlet; compare with commissioning data. Check burner gas pressure at the train.Raise the set point to compensate — it hides the fouling.
Burner locks out on start-upAir in the gas line, flame detector dirty, or ignition electrode gapRead the lockout code; clean the detector; check the electrode gap and the gas train vent.Reset more than three times without finding the code.
Feedwater pump cavitatesSuction strainer blocked, low tank level, or water above 80 °C without a deaeratorStrainer differential, tank level and feedwater temperature.Throttle the discharge to quieten the noise.
Water carries over with steamHigh total dissolved solids, foam, or sudden load changeBoiler water TDS and alkalinity; blowdown schedule; steam separator condition.Add anti-foam as a permanent fix.
High flue-gas temperatureScale on the waterside, soot on the fireside, or bypassed economiserCompare stack temperature with the commissioning sheet; inspect the economiser bypass damper.Keep running to the next planned shutdown.

Send the completed checks with the unit code. If the boiler is under warranty, say so in the subject line — warranty cases are routed to the engineer who commissioned the unit where records allow.

Documents

Manuals, drawings and certificates

The installation, commissioning and maintenance manuals are published by product family and can be downloaded without a login. Each PDF carries a SHA-256 hash, so a printed copy can be checked against the file we issued.

What to put in the email

  • Unit code (YXB-…)
  • Site country and city
  • Fault code from the burner or PLC
  • Operating hours since commissioning
  • What changed before the trip
  • Nameplate photo, if the code is unreadable

[email protected]

Planned work

Commissioning, training and overhauls

Quoted per project, with the scope written before travel.

Commissioning

Cold and hot commissioning checks, burner set-up, safety interlock test, operator walk-through and a signed handover sheet.

Operator training

Half-day to two-day programme on the actual unit: start-up, blowdown, water treatment, alarm handling and the daily log.

Overhaul

Fireside cleaning, tube inspection, refractory repair, burner service and control upgrade, scheduled around your shutdown.

FAQ

Support questions

What should I send with a service request?

Unit code, nameplate photo, site country, fault description, operating hours and the burner fault code. For pressure-part issues include the pressure-vessel certificate number.

Do you support burners and controls from other suppliers?

Yes, for boilers we supplied. Send the burner make, model and controller type; we keep commissioning records for the common gas, oil and biomass burners fitted at the works.

How fast are spare parts dispatched?

Stock items leave Taikang in two to three working days; made-to-order parts such as tubes, furnace sections and tube plates are quoted with a production slot. Air freight is used for stopped units.